Skip to main content

Free tool · Independent estimator

Asbestos report & testing cost calculator

Build a live cost estimate across sampling, surveys, re-inspections, air testing and management-plan authoring. Every unit rate is drawn from live 2024/25 fees for England & Wales — a formal fixed quote is returned within one working day.

Turnaround

  • Sampling on-site (per sample)

    Trained surveyor takes representative samples using HSG264 methodology.

    £65 per sample

  • UKAS 17025 lab analysis (per sample)

    Polarised light microscopy at accredited partner labs. Priority available.

    £18 per sample

  • Management Survey (per property)

    Non-intrusive baseline for CAR 2012 Regulation 4 compliance.

    £285 per propertie

  • Refurbishment & Demolition Survey

    Intrusive R&D survey ahead of works — required by Regulation 5.

    £495 per propertie

  • Re-inspection visit

    Annual / 6-monthly re-inspection of previously identified ACMs.

    £195 per visit

  • Reassurance air test (per test)

    PCM air monitoring following clearance or minor disturbance.

    £145 per test

  • Written management plan

    Bespoke, auditable asbestos management plan and risk register.

    £385 per document

What's included in each unit rate?

  • Sampling on-site

    Attendance, PPE, sample bagging, chain-of-custody documentation and return of unused material.

  • UKAS lab analysis

    Polarised light microscopy (PLM) with dispersion staining at ISO 17025 accredited partner labs. Priority 24h available.

  • Management Survey

    Full non-intrusive walk-through, photographic register, risk-scored asbestos register and management recommendations.

  • R&D Survey

    Intrusive inspection of areas to be altered, sampling of suspect materials, floor-plan-linked report.

  • Re-inspection

    6- or 12-monthly re-inspection of previously identified ACMs, updated risk scores and photos.

  • Air testing

    PCM reassurance monitoring following clearance or minor disturbance, results within 24 hours.

  • Management plan

    Written, auditable plan with named responsibilities, escalation and review cadence.

  • Turnaround uplift

    25% for 48-hour priority, 55% for same-day emergency mobilisation.