Skip to main content

CAR 2012 Regulation 4

Bespoke asbestos management plans.

The written plan that turns your register into a working compliance system — policy, roles, procedures and incident response, tailored to your estate.

What it contains

The four building blocks of a defensible management plan.

Written policy

A board-approved policy statement, scaled to the size and risk profile of your estate.

Roles & responsibilities

Clear allocation of duty-holder, competent person and contractor control responsibilities.

Operating procedures

Permit-to-work, hot-works and contractor induction procedures referencing the live register.

Incident response

Documented procedure for suspected disturbance, sample collection and HSE notification.

What's included

A complete document set, ready for board sign-off.

  • Written asbestos policy aligned to CAR 2012 Regulation 4
  • Defined duty-holder, dutyholder-appointed and competent person roles
  • Register and drawings integration, with version control
  • Permit-to-work and contractor control procedures
  • Tenant and visitor communication templates
  • Incident response and notification procedures
  • Training matrix and ongoing review schedule

Our process

From discovery workshop to board-ready document in 4 weeks.

01

Discovery

Workshop with your estates, H&S and compliance leads to map current arrangements, ownership and gaps.

02

Drafting

We draft the plan against CAR 2012 and your operating context — typically inside 2 weeks.

03

Review & sign-off

Two rounds of review with your team, with final board-ready sign-off pack.

04

Embed & train

Optional rollout support: tool-box talks, contractor briefings and annual review schedule.

4-week turnaround
CAR 2012 compliant
Single or multi-site

FAQs

Management plans — common questions.

Do I legally need a written asbestos management plan?

Regulation 4 of CAR 2012 requires duty-holders for non-domestic premises to have a written plan setting out how they manage asbestos risks. A documented plan is the standard evidence of compliance.

How long does it take to produce?

Most single-organisation plans are drafted within 2 weeks of the discovery workshop, with a further 1–2 weeks for review and sign-off.

Do you produce plans for multi-site estates?

Yes — a single corporate plan with site-specific annexes works well for multi-site estates. We tailor the structure to your governance model.

Do you provide training to support the plan?

Yes. We deliver duty-holder briefings, awareness sessions and contractor inductions, either on-site or virtually.

Build your asbestos management plan.

A short scoping call confirms scope, price and timeline. We typically deliver inside 4 weeks.

Get a quote

Get an asbestos management plan quote

Tell us the property and the survey you need. We'll confirm the scope and a firm price by phone or email — Management, Refurbishment, Demolition/R&D and sampling all quoted.

  • P402/P405 qualified surveyors
  • HSG264 survey methodology
  • Thousands of surveys completed
  • UKAS-accredited laboratory analysis
  • Independent — we do not sell asbestos removal

Get an asbestos survey quote

We'll confirm the scope and a firm price by phone or email before anything is booked.

Prefer to talk? 0208 036 1099 · WhatsApp

Book a Survey Now