Quick answer
For most flats and houses, a Management Survey takes 1–3 hours on site with the written report issued within 48 hours. Refurbishment Surveys take 2–5 hours, and Demolition Surveys take half a day or more. Larger commercial and communal blocks can take a full day.
Times by property
Rough on-site durations for typical UK properties:
| Property | Management | Refurbishment | Demolition |
|---|---|---|---|
| Studio / 1-bed flat | 1 hour | 2 hours | 3–4 hours |
| 2–3 bed flat | 1.5 hours | 2–3 hours | 4–5 hours |
| Terraced house | 2 hours | 3 hours | 5–6 hours |
| Semi-detached | 2–3 hours | 3–4 hours | 6–8 hours |
| Detached (3–5 bed) | 3–4 hours | 4–6 hours | 1 day+ |
Reporting turnaround
Reports are typically issued within 48–72 hours, once UKAS laboratory analysis has been returned. Large or unusually complex commercial projects may require a longer reporting period, which is confirmed when the scope is agreed.
Frequently asked questions
Common questions
Do I need to be there the whole time?+
No — as long as we have access, we can complete unattended.
Do bigger buildings scale linearly?+
Roughly. Complexity — voids, plant rooms, roofs — adds more time than floor area alone.