Period and listed property
In a listed building, an intrusive survey has to be planned so that opening-up is minimal and reinstatement is agreed in advance. We scope those instructions around the works actually proposed, and we say where inspection was not possible rather than guessing.
Later additions — flat-roof extensions, boiler flues, garage roofs, artexed ceilings over original plaster — are where the confirmed materials usually are.
