Scope the survey around the works
The Control of Asbestos Regulations 2012 require that asbestos is identified before work that may disturb it, and place a duty to manage on those responsible for non-domestic premises. For a fit-out, that translates into a practical question: which elements will actually be opened, cut or removed? A survey drawn around the proposed works — rather than around the whole demise — gives the contractor usable information without paying for areas that are staying untouched.
Send us the drawings or a scope of works and we will set the survey boundaries out in writing before the visit, including the areas we cannot access and what would be needed to reach them.